New EnviroHoard™ design takes sustainable hoarding to new heights

EnviroHoard, the UK’s first Net Zero verified sustainable hoarding system from Panthera Group, has been upgraded.

Now more sustainable than ever, its patent pending design has a number of unique features that each help to drive down the system’s embodied carbon. The new design offers the shallowest footprint for tight sites, is 100% reusable and can be installed in-ground or on-ground.

NEW low carbon block

At the heart of the upgrade is a brand-new low carbon block with 30% GGBS (ground granulated blast furnace slag) cement replacement. Manufactured in-house to ensure quality and to reduce embodied carbon, the innovative EnviroBlok has many features to ease installation.

A strategically positioned cast-in channel and M16 sockets allow for rapid installation on uneven ground up to a gradient of 1:8.

EnviroBlok is designed to connect at all three corners where there are increased loads on the hoarding and is stacked at free ends to comply with temporary work requirements. The blocks can be stacked three high to meet the UK’s three wind zones and feature an integrated slot for forklift tines. A 2.5 tonne rated lifting pin ensures safe movement on site.

New steel support framework

Engineer-designed to work in conjunction with EnviroBlok, the new support frame is strong, simple and quick to install and is designed to meet the UK’s three wind zones for temporary works compliance. The frame features unique adjustable brackets that connect the block to the post with a mechanism that can be adjusted for gradients up to 1.8m.

Additionally, rail support brackets allow horizontal levelling of the system to enable installation on uneven ground. ‘Fixing-free’ rails increase speed of installation, adaption and dismantling of the hoarding system.

The highly flexible framework system meets the needs of hoarding projects large and small.

Standard height is 2.4m but it can be extended up to 3.6m high and has the ability to integrate lighting and cable support brackets.

EnviroHoard panels

EnviroHoard panels are made from 100% post-industrial and post-consumer waste uPVC. A truly closed loop system, the panels can be used multiple times and recycled at the end of their useful life back into pellets for making new panels. Options include 2.4m, 3.0m and 3.6m depending on the clients’ requirements. Mesh extensions either 600 or 1200mm in height are also available.

EnviroHoard SCAFFOLD is a sustainable alternative for encasing scaffold including towers, straight runs and even soffits. Heights up to 7m with or without mesh are available.

EnviroFence is the highest no-dig, temporary fence system in the UK. Offering rapid perimeter protection up to 3.6m in height it is designed to meet BS1722-14; the same as permanent rigid mesh panel fencing.

EnviroHoard and EnviroFence enhancements include electronic security alarms, cable support brackets, anti-climb rolling spikes, bulkhead lighting, PVC-Free graphics, Living Hoarding and pedestrian and vehicle gates. All hoarding systems are supplied with engineer’s calculation and design drawings in accordance.

EnviroHoard is the first sustainable hoarding system to be verified Net Zero Carbon and has gone through an extensive cradle to grave Life Cycle Assessment (LCA) to EN15804:2019. It is between 60 – 70% lower embodied carbon than a plywood hoarding; even more on longer terms projects. Climate positive benefits includes the planting of trees both in the UK and globally.

 

Find out more: www.pantheragroup.com/sustainable-construction-site-hoardings

This article was originally published in AccessPoint Magazine, if you would like to receive future editions of the magazine for free you can join the mailing list here:

AccessPoint Magazine Mailing List

You can read the latest edition of the magazine online here:

AccessPoint Magazine Latest Issue

Share on facebook
Share
Share on twitter
Share
Share on linkedin
Share